Reuse existing platforms
Select a chassis by payload, dimensions and motion requirements; reuse shared hardware, device management and mobility capabilities.
JDM · JOINT DESIGN & MANUFACTURING
Joint design and manufacturing for robot brands, industry product companies, integrators and algorithm teams. Reuse standard chassis, shared hardware, unified interfaces and in-house algorithms to develop your product, upper modules and applications.
PLATFORM-BASED PROJECTS · TARGET TIMELINE
Reuse the chassis and controls, integrate upper modules and test core functions.
Complete scenario testing and design iterations; agree mechanical, hardware, software and acceptance requirements.
Complete pilot validation, sourcing, assembly and test preparation, then begin volume production.
These are cumulative target milestones from confirmed requirements and solution for projects that substantially reuse existing platforms. Agree the schedule against the project scope and solution.
Select a chassis by payload, dimensions and motion requirements; reuse shared hardware, device management and mobility capabilities.
Integrate customer algorithms or third-party intelligence through ROS 1 / ROS 2 drivers and TCP/IP interfaces, with scope agreed per project.
After agreeing interfaces, develop upper modules, electrical systems, controls and applications in parallel, then validate against acceptance criteria.
Use Shuangling Group manufacturing resources to prepare BOMs, sourcing, assembly and testing, progressing through pilot validation to volume production.
Agree algorithm configuration, interface support, reusable modules and manufacturing arrangements for each product and project.
Shining Robotics delivers the agreed platform and product engineering. You define the application, upper modules, environment and intelligence. We agree deliverables, software and source-code scope, intellectual property, acceptance and supply.
Standard drivers include source code; algorithms do not. Agree other software and firmware boundaries per project. Assess the schedule, cost and additional services against the project scope.
About Shining Robotics & ManufacturingAgree the application, configuration, interfaces and deliverables.
Develop mechanics, electrical systems, controls and upper modules.
Validate prototypes against agreed scenarios and acceptance criteria.
Confirm the final configuration, production and supply plan.
APPLICATION ARCHIVE
These archived applications illustrate mechanical, hardware, algorithm and complete robot development. Confirm configuration, interfaces, supply and acceptance for each project.
Factory material delivery and workstation replenishment, with development experience evolving into the SR-D800 product line.
Complete robot development for reception and interaction, forming a reception robot product line.
Requirements confirmation, development and integration, prototype validation, and production introduction. Reference milestones: functional prototype in 1 month, design finalization in 3 months, and mass production in 6 months. These are cumulative target milestones from confirmed requirements and solution for projects that substantially reuse existing platforms. Agree the schedule against the project scope and solution. Agree responsibilities, deliverables, source-code scope, intellectual property and acceptance per project.
Connect customer or third-party intelligence through ROS drivers or TCP/IP interfaces. Confirm motion control, feedback and algorithm integration against the selected configuration.
Standard platforms include ROS drivers, driver source code and TCP/IP interface documentation. Algorithm source code is not supplied. Agree other software, firmware and intellectual property per JDM project.
Describe the task, environment, payload, existing upper modules or algorithms, expected quantity and target schedule. Unconfirmed details can follow during discussion; attachments are optional. We will reply within 2 working days.